Endeavours Sea Scouts Hall

Community Hall – Bespoke Construction Delivered to Council Specification

Foundations & Site Setup with Reinforced Sub-Base

Groundworks established using load-rated concrete and compacted substrate, tailored to site-specific tolerances

Wall Construction & Structural Masonry Install

Brick and blockwork laid to design spec with lateral restraint systems and corrosion-resistant fixings

Steel Bracing for Frame Stability

Fitted to reinforce key structural junctions in line with BS EN codes, ensuring resistance to wind and racking forces

Electrical Installation & Life Safety Systems

Cabling routed to plan, fully tested and commissioned, including fire alarm integration under BS 5839 compliance

New Drainage Infrastructure & Water Services Setup

Pipework configured to council standards with backflow prevention, rodding access, and sealed connections to main lines

Roofing Works with Truss Fitting & Weatherproofing

Pre-formed trusses aligned and anchored with bracketed ties; membrane applied for long-term water ingress protection

Kitchen Install with MEP Service Coordination

Joinery completed to layout drawings, services interfaced through coordinated plumbing and electrical feeds

Internal Flooring Prep & Finish

Screeded to SR2 level accuracy and surfaced with commercial-grade vinyl, edge-sealed for slip and moisture control

Health & Safety Assurance Throughout

Site governed by Hillingdon Council’s strict compliance protocols; RAMS documentation maintained daily with full CDM coverage

During Works

After Works

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.
You need to agree with the terms to proceed

Menu