2nd Ickenham Scouts Hall

Scouts Hall – Full-Scope Construction Delivered to Council Grade

Precision-Laid Foundations & Site Establishment

Executed to council-approved specifications using reinforced formwork and engineered depth tolerances to ensure structural longevity and subsoil stability

Masonry & Structural Works to BS 5628 Standards

Brick and block installation carried out with calibrated wall ties, padstones, and embedded lintels, ensuring compliance with current structural load requirements

Steel Bracing Installation for Lateral Support

Expertly installed to meet BS EN 1993 structural steel standards, reinforcing frame rigidity and safeguarding against torsional stress

Certified Electrical Installation & Fire Alarm System Commissioning

Complete internal wiring and alarm systems delivered in line with BS 7671 regulations, NICEIC tested and signed off for occupancy

Plumbing Works & Drainage Line Configuration

New waste and water systems routed to fall with rodding access points and council-consented connection methods, adhering to BS EN 12056

Roof Installation with Fitted Truss System

Pre-engineered trusses installed with bracketed bracing and load-spreading fixings; works completed in accordance with BS 5268-2

Kitchen Fit-Out with MEP Coordination

Services coordinated and installed to mechanical/electrical drawings, with integrated plumbing and electrical routing for functional efficiency

Screeded Substrate with Vinyl Flooring Installation

Screed poured and levelled to SR2 tolerance, followed by commercial-grade vinyl laid to spec with edge-sealing for moisture protection

Construction to Council Health & Safety Standards

All works delivered under full CDM compliance, with daily risk assessments, method statements, and RAMS documentation maintained on-site